Turnkey works within the scope of the project: 103,000 m³ of excavation, 7,000 m³ of fill, 4,000 m³ of reinforced concrete works, 5,800 meters of sewerage and drainage infrastructure works, 9,600 m² of curb works, 228,000 tons of hot-mix asphalt road works, 10,400 meters of guardrail works, and electrical works
Copyright © 2025 All Rights Reserved. Sare Medya