Turnkey construction, architectural, infrastructure, electrical and mechanical installation works for a total of 24,300 meters of sewerage and stormwater lines, 21,700 meters of drinking water lines, a 500 m³/day wastewater treatment plant, water tanks and other structures within the scope of the project
Copyright © 2025 All Rights Reserved. Sare Medya