Turnkey construction, architectural, infrastructure, electrical and mechanical installation works for a total of 268,000 meters of sewerage and stormwater lines, 186,500 meters of drinking water lines, water tanks and other structures within the scope of the project
Copyright © 2025 All Rights Reserved. Sare Medya