Turnkey works within the scope of the project: 1,080,000 m³ of excavation, 104,000 m³ of concrete works, 149,800 m² of hot-mix asphalt road works, 133,700 tons of plant-mix works, 34,500 m² of paving works, 37,800 meters of guardrail works, and 59,600 meters of bored pile works.
Copyright © 2025 All Rights Reserved. Sare Medya