Turnkey works within the scope of the Discharge of Treated Water from the Ergene Basin OIZ Joint Wastewater Treatment Plants into the Marmara Sea Project: construction of a 4,500-meter discharge line for the treated water sea outfall, using a 2,200 mm diameter steel pipe with a 220 mm thick concrete coating, discharging at a depth of 50 meters