PROJECTS

Rize South Ring Road (Including Salarha Tunnel and Connection Roads) Road Construction Work

1,080.000 m3 excavation works, 104,000 m3 concrete works, 149,800m2 bituminous asphalt works, 133,608 tons subbase works, 34,500 m2 paving works 37,800 meter guardrail works and 59,600 meter piling works as turnkey contract at project.

  • Date2019
  • LocationRİZE
  • EmployerKARA YOLLARI GENEL MÜDÜRLÜĞÜ-İNTEKAR YAPI TUR.ELEK.İNŞ. SAN VE TİC.LTD.ŞTİ